415.898.1400

Confidential Financial Institution

 

Division:

W. Bradley Electric


Location:

San Francisco, CA


Project Cost:

$1,500,000


Description

WBE replaced the building’s 1200 amp motor control center located on the 19th floor with new 1200 amp distribution board and reconnected all the existing loads that were to remain.

We installed an additional new 1200 amp distribution switchboard on 19th floor to pick up new mechanical equipment as part of the chiller replacement project. We provided branch feeders and connections to new chillers located on roof and associated pumps.

The project required two full building shut downs. The first shut down was for the main switch-board survey and the second was to demolish existing MCC and to install a new distribution switch-board.

Verified by MonsterInsights