415.898.1400
LinkedIn

LinkedIn

LinkedIn Division:WBE Telcom DivisionLocation:Mountain View, CAProject Cost:$1,077,000.00Description:LinkedIn required Installation of all Data Infrastructure to 3 Buildings. Each Building has 2 Floors with all cabling terminating on the 2nd floor. Termination style...
Wells Fargo Concord

Wells Fargo Concord

Wells Fargo Bldg. 1655 & 1755 Division:W. Bradley Electric, Inc.Location:Concord, CAProject Cost:$8,610,485.00 Description:This project is 2 buildings on Grant St. in Concord, CA. Building 1655 Floors 2-5 (90,500 sq. ft.) that consist of new open office space,...
Ernst & Young

Ernst & Young

Ernst & Young Division:W. Bradley Electric, Inc.Location:San Francisco, CAProject Cost:$4,212,411.00Description:This project consisted of complete demolition and build out of four floors (19,500 sq. ft. per floor) of class A office space. The build out was...
Airbnb – 888 Brannan

Airbnb – 888 Brannan

Airbnb – 888 Brannan Division:W. Bradley ElectricLocation:San Francisco, CAProject Cost:$1,642,688.00DescriptionThis project included 2nd and 3rd floor build-outs which consisted of 32,000 sq. ft. of unique open office space accented with different area...
Levi Plaza – Stern Lobby

Levi Plaza – Stern Lobby

Levi Plaza – Stern Lobby Division:W. Bradley ElectricLocation:San Francisco, CADescription:WBE tackled the Italian Swiss Colony Building, originally designed by Hemenway and Miller and built in 1903. It was remodeled and repurposed as an office building as part...
Verified by MonsterInsights