GAP Pleasanton Division:WBE Telcom, WBE Audio Visual, WBE SecurityLocation:Pleasanton, CADescription:This project was a build out of 2 floors for GAP’s office building in Pleasanton. Each of these floors had exposed ceilings with cable trays routing the...
Five Prime Division:WBE TelcomLocation:South San Francisco, CADescription:This project consisted of pulling Cat 6 cabling in a 4 story building for station and WAPS. The cabling solution used is Belden. WBE Telcom pulled fiber and copper backbones from the Server room...
Facebook Division:WBE TelcomLocation:Menlo Park, CADescription:This project for Facebook was a unique one in which all the station cabling needed to be perfectly dressed inside the exposed cable tray throughout the entire building. This included dressing the cable...
Google Pacific Shores Divisions:W. Bradley Electric, WBE TelcomLocation:Redwood City, CAProject Cost:$16,885,000Description:This project consisted of 2 buildings. 1600 Seaport Blvd is a 5 story building (137,000 sq ft) with all new electrical systems, fire alarm,...
UBS Financial Services Division:W. Bradley ElectricLocation:Walnut Creek, CA Description:This project consisted of a full floor and a partial second floor of High Level Tenant Improvements with new lighting and Greengate lighting controls throughout. WBE also...