Wilmerhale Division: Electrical, Telcom, Audio Visual Location: Palo Alto, CA Description: WBE’s Electrical division completed a buildout of this 40,000 sq ft. building. The project included a mixture of open, grid, and hard lid ceilings with lighting...
SAP Division: WBE Audio Visual Location: San Ramon, CA Description: SAP Engineering Academy was a unique project, with many design challenges and interesting spaces. There is a large amphitheater style all-hands space complete with a truss-mounted ring of...
Confidential Retail Company Division: Electrical, Telcom, Audio Visual, Security Location: Novato, CA Description: This project was of a remodel of 2 floors in an existing building (41,866 sq ft). Complete tenant improvement including state of the art lighting...
GAP Pleasanton Division:WBE Telcom, WBE Audio Visual, WBE SecurityLocation:Pleasanton, CADescription:This project was a build out of 2 floors for GAP’s office building in Pleasanton. Each of these floors had exposed ceilings with cable trays routing the...
Wells Fargo Swift 1655 & 1755Â Division:WBE Audio Visual DivisionLocation:Concord, CAProject Cost:$1,000,000.00Description:This project included installation of AV systems for Open Colabs, Huddles, and conference rooms. Rooms feature LED displays with auto on and...