SRJC PROJECT DETAILS SRJC Santa Rosa, CA WBE installed a new redundant fiber-optic system to support over 30+ buildings. The core of the system is a 288 fiber strand cable that creates a “loop” around the campus. It currently includes 1,728 single mode...
San Marin High Field Lighting Division: WBE Traffic Signal & Street Light Division Location: Novato, CA Description: WBE Traffic Division teamed up with BHM Construction on the installation of new (Musco) stadium field lighting for our local San Marin High...
Solano Community College Division:W. Bradley Electric, Inc.Location:Fairfield, CAProject Cost:$3,100,000Description:This is a full design-build project for Solano Community College’s new 44,000 sf Science Building. The building will house General Labs, Lecture...
Skyline College Division: WBE Traffic Signal & Street Lighting Location: San Bruno, CA Description: This project included installation of new parking lot lights/poles, security cameras, wireless access points, bollard pathway lighting, pedestrian street lighting,...
Overfelt Highschool Division:W. Bradley ElectricLocation:San Jose, CADescription:WBE provided and installed branch power circuits over to (4) battery cabinets provided by GCN. These battery cabinets were put in place to help take some of the load off of the PG&E...