415.898.1400
Wells Fargo Swift 1655 & 1755

Wells Fargo Swift 1655 & 1755

Wells Fargo Swift 1655 & 1755 Division:WBE Audio Visual DivisionLocation:Concord, CAProject Cost:$1,000,000.00Description:This project included installation of AV systems for Open Colabs, Huddles, and conference rooms. Rooms feature LED displays with auto on and...
Wells Fargo 333 Market

Wells Fargo 333 Market

Wells Fargo 333 Market   Division: W. Bradley Electric, WBE Telcom Location: San Francisco, CA Description: This Wells Fargo project was a tenant improvement of the ground floor and mezzanine in the Annex at 333 Market St. in San Francisco. The project included...
BioMarin SRCC TE

BioMarin SRCC TE

BioMarin SRCC Division: WBE Telcom Division Location: San Rafael, CA Description: The Telcom installation for BioMarin included 2 buildings totaling 6 floors. The entire project included 6 IDF’s and 1 Server Room. We used a  Systimax Solution with a Uniprise...
BioMarin SRCC AV

BioMarin SRCC AV

BioMarin SRCC Division:WBE Audio VisualLocation:San Rafael, CADescription:WBE Audio Visual completed a 3 month project in which they installed AV systems in multiple rooms, which all were controlled by Extron MediaLink Controllers. In addition to Extron Control...
LinkedIn

LinkedIn

LinkedIn Division:WBE Telcom DivisionLocation:Mountain View, CAProject Cost:$1,077,000.00Description:LinkedIn required Installation of all Data Infrastructure to 3 Buildings. Each Building has 2 Floors with all cabling terminating on the 2nd floor. Termination style...
Verified by MonsterInsights