415.898.1400
Five Prime

Five Prime

Five Prime Division:WBE TelcomLocation:South San Francisco, CADescription:This project consisted of pulling Cat 6 cabling in a 4 story building for station and WAPS. The cabling solution used is Belden. WBE Telcom pulled fiber and copper backbones from the Server room...
BioMarin Project Faith

BioMarin Project Faith

BioMarin- Project FAITH(2018 Facility of the Year Awards Category Winner for Project Execution)Click to read more about this winning project!Judges’ panel conclusion: Demonstrates how, when teamed with the industry’s best people, equipped with the right...
BioMarin SRCC TE

BioMarin SRCC TE

BioMarin SRCC Division: WBE Telcom Division Location: San Rafael, CA Description: The Telcom installation for BioMarin included 2 buildings totaling 6 floors. The entire project included 6 IDF’s and 1 Server Room. We used a  Systimax Solution with a Uniprise...
BioMarin SRCC AV

BioMarin SRCC AV

BioMarin SRCC Division:WBE Audio VisualLocation:San Rafael, CADescription:WBE Audio Visual completed a 3 month project in which they installed AV systems in multiple rooms, which all were controlled by Extron MediaLink Controllers. In addition to Extron Control...
BioMarin SRCC EL

BioMarin SRCC EL

BioMarin SRCC   Division: W. Bradley Electric, Inc. Location: San Rafael, CA Project Cost: $3,300,000.00 Description: WBE Electric completed a year long project of a new ground up three story lab building and four story parking structure for BioMarin, a...
Verified by MonsterInsights