Waterfront Park Renovation Project

Waterfront Park

Division:

WBE Traffic Signal & Street Light


Location:

Martinez, CA


Project Cost:

$1,989,000


Description:

The Waterfront Park renovation project includes the demolition of the existing park area and the reconstruction of four new lighted baseball fields, restrooms, and lighted walking paths. WBE Traffic installed 18, (70-80′ tall) high mast lighting poles with LED fixtures around the four ball fields. The high mast lighting poles also include lower ball tracking lighting that will help illuminate the balls hit into the outfield. All the lighting on this project was build with the most energy efficient products available on the market. The ball field lighting and pathway lighting continually adjust the lumen output based on natural light and motion detection.