Local 38

San Francisco, CA

WBE’s Audio Visual team was tasked with integrating new Zoom and BYOD compatible devices through the conference rooms with wireless share capability. The room build-outs were challenging with advanced audio programming and integrating the newest Barco clickshare technology within each room. We also are building a large grand hall venue on the first floor utilizing a large format projector screen and 4K laser projector, with large column speaker arrays for great audio clarity throughout the space.

Our Electrical team installed conduit pathways for data division throughout the site. We came in late to the project just as finishes were being installed. The flooring contractor was right behind us as we were working off ladders. We had one week to complete all the conduits.

Telcom team installation included data cabling, fiber backbone cabling, and coaxial cabling.  These systems were all ran to (4) MDF/IDF locations.  Space concerns made the IDF locations a lot smaller than typically planned.  WBE utilized wall mount racks to house all network equipment and cabling

 

Divisions: Electrical, Telcom, Audio Visual,                        Security

 

Verified by MonsterInsights